Statutory Electrical Compliance & Trade Tax That Pays for Itself
Eliminate 5+ hours of paperwork every week. Instant I.S. 10101 test schedule verification, automated Civil Service 4-band Revenue motoring claims, two-tier 13.5%/23% split invoices, and on-the-spot Revolut Pay collection.
✓ No credit card required • Instant offline PWA • Revenue & Safe Electric Compliant
EV Home Charger Installation (Zappi 7.4kW)
Aoife Murphy • 086 987 6543
Run Site Operations with Zero Dead Time
Turn your van into a high-performance command center. Everything you need from arrival to handover is linked directly to the job: 1-tap Eircode GPS routing, site access keybox codes, and automated crew dispatch.
The active card morphs as you work: Scheduled → 7-Step LOTO Pre-Check → Testing → Cert 3 → Split VAT Invoice.
Lockout-Tagout (LOTO) padlock verification and voltage proving unit double-checks before drilling or terminating.
Snap Kellihers, Rexel, and EWL dockets at the trade counter to immediately reclaim 23% input VAT.
Statutory Certification with Live Zs Limit Math
Never get caught out on a Safe Electric regulatory audit. Issue legal digital certificates on-site with automated earth fault loop impedance (Zs) verification against National Rules Table 41.3/41.4, derated with the mandatory 80% field ambient temperature rule.
Covers domestic connections (< 50 kVA), customer substations (≥ 50 kVA), alterations, reconnects (> 6 months), and non-restricted minor works.
Classify Code C1 (Danger), C2 (Urgent), C3 (Improvement) defects with camera photo compression and automatic condition assessment.
Tracks 12-month lab calibration dates, alerts at 30 days, prevents sign-off on expired gear, and stamps instrument serials onto cert headers.
Test Record Sheet (TRS Table)
Built Directly to Irish Statutory Criteria
Every certificate, farm check, grid notification, and life safety schedule ready for on-site execution.
Cert 1 (<50 kVA)
New Connection Completion Cert
Single-phase & 3-phase initial verification schedules for domestic & small commercial DSO energisation.
Cert 2 (≥50 kVA)
Large Commercial / Substation
Industrial incomers, customer transformer substations (10kV/20kV), and Chartered Engineer sign-offs.
Cert 3 (Existing)
Alterations & Board Replacements
Clause 132.16 earthing affirmations, sub-circuit additions, consumer unit changes, and EV chargers.
PIR / EICR Report
Condition Assessment
Visual 9-point schedule with C1 (Immediate Danger), C2, C3 defect classification & photo audit logging.
Reconnection
Disconnected >6 Months
Full insulation integrity testing and DSO notification required prior to ESB Networks service restoration.
Minor Works
Non-Restricted Works Docket
Fast homeowner handover for like-for-like accessories, immersion switches, and minor alterations.
Notice of Hazard (NoHz)
Dangerous Installation Report
Statutory emergency notification issued to the duty holder and reported to Safe Electric upon C1 discovery.
ESB Form NC6
Micro-Gen Notification (≤11 kW)
Standardized Notify & Fit commissioning for rooftop solar PV and battery storage with G100 limiter support.
ESB Form NC7
Mini-Generation (12–50 kVA)
Formal commercial export applications with Volt-VAr curves, EN 50549-1 certs, and SLD drawings.
SEAI EV Grant Pack
1-Click €300 Homeowner Dossier
Bundles the Safe Electric Cert 3, VAT invoice, and equipment serial commissioning sheet into an SEAI PDF.
Emergency Lighting
I.S. 3217 Annex C2 Testing
Annual 3-hour autonomy verification, escape route lux schedules (≥1.0 lux), and commissioning records.
Fire Detection & Alarms
I.S. 3218 Category L1–L4
Audibility dB(A) verification (≥65 dB general / ≥75 dB bedhead), break glass testing, and panel commissioning.
Farm S101 Suite
DAFM TAMS III & Section 705
Special agricultural rules: 25V AC livestock touch voltage checks, parlour floor grid bonding, and 300mA RCDs.
Commercial 3-Phase
Power Factor & kVAR Wattless
Capacitor bank sizing to eliminate ESB Networks reactive power penalty tariffs (cos φ < 0.95).
Apprentice SOLAS
Phase 1–7 Craft Logbook
On-the-job curriculum hours logging, module verification, and Qualified Certifier digital countersigning.
HSA Site RAMS
1-Page BeSMART.ie Safety Plan
Site safety statement under Safety, Health & Welfare at Work Act 2005 with 7-step LOTO lockouts.
Reclaim Thousands in Allowable Trade Deductions
Stop leaving money on the table. Built specifically for Irish electricians to handle two-tier split VAT, Section 41 Two-Thirds Rule validation, 0% commercial reverse charge, 4-band van mileage, and Form 11 self-assessment with zero accounting friction.
Charge 13.5% on electrician labor and 23.0% on supply materials with live Section 41 Two-Thirds Rule validation, eliminating ROS filing errors.
Automatically log wholesale runs and callouts across the 4 cumulative Civil Service mileage bands (up to 90.63c/km tax-free).
Apply Section 59(2A) 0% Reverse Charge VAT and 5%/10% retention accounting for principal contractors and eRCT.
Revenue Split-Rate Invoice
Irish Revenue Compliance That Protects Your Bottom Line
Two-tier split VAT, progress retention claims, 4-band van mileage, and annual Form 11 / CT1 tax returns.
Revenue Split Invoices
Two-Tier Split VAT (13.5% / 23%)
Enforces the statutory Section 41 Two-Thirds Rule with live alerts and integer-cents ROS precision.
Progress Claims
Commercial Retention (0% RC)
Section 59(2A) 0% reverse charge accounting with 5% and 10% retention calculations for commercial tenders.
Quote Estimator
Wholesale Catalogs & Margins
Turn trade prices from Kellihers, Rexel, and EWL into client proposals with selectable margin chips.
eRCT Notifications
0%, 20%, 35% Deduction Vouchers
Contract notifications and site deduction authorizations validated against ROS tax numbers.
Merchant Dockets
Wholesale Receipt Vault
Camera docket scanner logging 23% input VAT and preserving purchase proofs for 6 full tax assessment years.
Mileage Tax Center
Civil Service 4-Band Motoring
Tax-free motoring travel claims under Revenue Circular 16/2022 (up to 90.63c/km tax-free).
VAT 3 Return
Bi-Monthly Box T1 / T2
Real-time calculation of Box T1 (Output VAT) and Box T2 (Input VAT) for electronic ROS filing.
Return of Trading (RTD)
Annual Statistical Reconciliation
Reconciles annual net sales and wholesale purchases across all Irish VAT rate bands (23%, 13.5%, 0%).
Form 11 Self-Assessment
Case I Sole Trader Tax Return
Net trading profit calculations with progressive tiered USC, 4.10% PRSI Class S, and preliminary tax safe-harbour.
Form CT1 Corporation Tax
12.5% Trading / 25% Passive
Corporate profit schedules, preliminary corporation tax schedules, and allowable software write-offs.
Vehicle BIK Calculator
Van 8% Flat Rate vs. EV OMV
Finance Act statutory Benefit-in-Kind payroll valuation for commercial work vans and zero-emission vehicles.
Capital Gains & CAT
10% Entrepreneur Relief
Calculates business asset disposal reliefs and gift/inheritance lifetime threshold computations.
Tailored for Solo Electricians, RECs & Large Engineering Crews
From craft apprentices completing SOLAS logbooks to master contractors running multi-van commercial fleets.
Spark Solo
For apprentices, non-REC sparks, and maintenance operatives.
Spark Office Pro
Complete compliance, invoicing, and tax suite for independent electrical contractors.
Frequently Asked Trade Questions
Everything you need to know about statutory compliance, Revenue rules, and offline functionality.
Spark Office serves as your on-site engineering calculation tool and mandatory 5-year digital audit vault. It calculates your Table 41.3 ambient Zs limits, balances 3-phase boards, checks RCD disconnect times, and formats complete schedules so you can enter your official Safe Electric serial number and archive your test records in one click.